CLASS OF PERMIT |
PERMIT FEE |
ADMINISTRATION FEE |
-$50.00 To be applied to all building permits |
BUILDING PERMIT |
|
- New Construction-Residential
- Dwelling units, semi detached, row housing, and apartments. (residential includes attached garages)
- New Commercial/Industrial/Institutional
|
*$8.00 per $1,000.00 or part thereof of the estimated valuation
of the work with a minimum fee of $50.00
|
Additions/Alterations/renovations
Residential/Commercial/Industrial/Institutional |
-$8.00 per $1,000.00 or part thereof of the estimated valuation
of the work with a minimum fee of $50.00 |
where work includes plumbing |
-$8.00 per fixture unit |
ACCESSORY BUILDINGS
Garages, boat houses, sheds, other accessory buildings |
-$8.00 per $1,000.00 or part thereof of the estimated valuation
of the work with a minimum fee of $50.00 |
New foundation under existing house
(based on three inspections) |
- $225 |
Decks |
-$8.00 per $1,000.00 or part thereof of the estimated valuation
of the work with a minimum fee of $50.00 |
Porches |
-$8.00 per $1,000.00 or part thereof of the estimated valuation of the work with a minimum fee of $50.00
|
Carports |
-$8.00 per $1,000.00 or part thereof of the estimated valuation
of the work with a minimum fee of $50.00 |
Outdoor solid fuel burning device |
-$100 |
Fire Place |
-$100 |
Wood Stove |
-$100 |
PLUMBING PERMITS |
-$8.00 / fixture unit |
AGRICULTURAL PERMITS |
|
New constructions and additions |
-$8.00 per $1,000.00 or part thereof of the estimated valuation
of the work with a minimum fee of $50.00 |
Soft Top (Coverall) |
- $225 |
Green house (poly type for all uses including agriculture, residential) larger than 10 meters square |
- 75.00 |
CONDITIONAL PERMIT |
-$50.00 |
CHANGE OF SEPTIC TO SEWER |
-$1300 |
DEMOLITION PERMIT |
-$50.00 |
OCCUPANCY PERMIT |
-$50.00 |
RENEWAL OF PERMIT |
- $50.00 |
TRANSFER OF PERMIT |
- $50.00 |
CHANGE OF USE PERMIT |
- $50.00 Permit alone
- $50.00 + the cost of construction where construction is to be completed |
DISCHARGE OF ORDER |
- $50.00 per occurrence |
BUILDING WITHOUT A PERMIT |
-$250.00 to be added to permit fee if permit is granted.
In the event the permit is denied, the $250.00 will be charged on its own. |
MOVING OF BUILDINGS |
- $100.00 |
TEMPORARY BUILDING |
- $50.00 |